Observation - 201921818 Audit Trail    << HEART Home  
What Next...

You can take the following actions on this observation:

Back
Originator:
Date Created:
23-Aug-2019
Business Unit:
Consulting
Business Group:
Energy Optimisation & Innovation
Project/Office:
E&II Renewables
Sub Business Group:
EMEA
Site/Office Name:
E&II Renewables (onshore)
Work Related or Non-Work Related Observation?:
Work Related
Exact Location or Project of Act/Condition/Safe Behaviour:
Statkraft Hitra 2 wind farm, 7240 Norway
Observation Type:
Unsafe Condition
Observer Name:
 Andrew Martin
Observer Email Address:
andrew.martin5@woodplc.com
Originator Status:
Wood
Stakeholder:
Contractor
Observation Date:
22-Aug-2019
Observation Time:
12:00
Observation Close Date:
15-Feb-2021
Observation Category:
Procedures and Instructions
    Followed / Not Followed
Details of safety observation:
Client identified that one of the bolts from the base of a permanent onshore met mast, installed for over one year, could be removed by hand. The installation of this part was the client group's responsibility but it was Wood's subcontractor's responsibility to inspect and accept the client group's work - evidently this was not done.
Immediate action taken:
See client's HSE non-conformity report, along with Wood response, attached.
Feedback required?:
No
Comments from Reviewer
Action to be taken:
The integrity of the mast will not be affected by these bolts, however, it has been communicated that all masts will not be climbed until an inspection of all associated projects have been checked. The checks will start as on next week for up to 1 months.
Supporting Information:
Comments from OU Admin
Closing Comments:
Action taken

      