Wood HEART
 HEART - Harm Elimination and Recognition Tracker  Help     
Observation Recorded Under Review Waiting for Action Closed  
 
Observation - 201900419 Audit Trail    << HEART Home  
What Next...

You can take the following actions on this observation:

Back
Originator:
Date Created:
11-Jan-2019
Business Unit:
E&I Solutions
Business Group:
Europe
Project/Office:
UK Built Environment
Service Line:
Remediation and Ground Engineering
Site/Office Name:
Shrewsbury (Built Environment)
Home or Work Related Observation?:
Work
Exact Location or Project of Act/Condition/Safe Behaviour:
Alderbury NGGT site: Drilling BH02
Observation Type:
Unsafe Act
Observer Name:
 Lewis Miffling
Observer Email Address:
lewis.miffling@woodplc.com
Originator Status:
Wood
Stakeholder:
Contractor
Observation Date:
17-Dec-2018
Observation Time:
11:00
Observation Close Date:
18-Jan-2019
Observation Category:
Contractor Site safety
    Safety awareness & behaviour
Details of safety observation:
Whilst attaching additional rods (3m) to drill string second man stepped up on clamp arm to position rod so it could be attached.
Immediate action taken:
Wood Site Engineer (Sarah Evans) immediately told second man to get down, not to do it again and to revert back to 1.5m rods which can be adjusted, if required, from the ground without the need to step up. Incident was witnessed and recorded by dnvgl site auditor who was satisfied with the actions taken on site
Supporting Information:
Feedback required?:
No

      


Wood HEART