Wood HEART
 HEART - Harm Elimination and Recognition Tracker  Help     
Observation Recorded Under Review Waiting for Action Closed  
 
Observation - 202226809 Audit Trail    << HEART Home  
What Next...

You can take the following actions on this observation:

Back
Originator:
Date Created:
22-Apr-2022
Business Unit:
Operations
Business Group:
Americas
Sub Business Group:
US South
Project/Office:
O&M South (C&M) – ExxonMobil
Site/Office Name:
Exxon Baytown BOP
Client:
ExxonMobil
Work Related or Non-Work Related Observation?:
Work Related
Exact Location or Project of Act/Condition/Safe Behaviour:
Train 2
Observation Type:
Safe Behaviour
Observer Name:
 Luis Guerrero
Observer Email Address:
luisguerrero1109@gmail.com
Originator Status:
Wood
Stakeholder:
Wood
Observation Date:
21-Apr-2022
Observation Time:
01:30
Observation Close Date:
22-Apr-2022
Observation Category:
Contractor Site safety
    Barrier / Segregation
Craft:
Could this have caused a life-changing injury, fatality, or stopped work at the site or location?
Does this observation relate to a task that was planned, included a risk assessment, and was subject to a task briefing?
Name of Individual or Team:
Majors
Details of safety observation:
The unit we are working (Train 2) had some gaps in between the hard barricade due to material being moved in and out, when the material was safely moved in, the workers would place the barricade back in place with no gaps as to no allow anyone who didn't need to be inside access.
Immediate action taken:
The barricade was put back as needed when material was dropped off. Proper management was taken.
Supporting Information:
Feedback required?:
No

      


Wood HEART